April 26, 2013
A member of the volunteer team installs a newer, more accessible shower head and a bar for stability, inside the shower. The bathroom was also taped off, in preparation for a new coat of paint.
April 26, 2013
A member of the volunteer team installs a newer, more accessible shower head and a bar for stability, inside the shower. The bathroom was also taped off, in preparation for a new coat of paint.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment
Or login with:
OpenID