April 29, 2013
The pedestrian pavilion (foreground) shows the connecting point for the future bridge to connect the pedestrian bridge across Route 123 at the Tysons Corner Station to commercial structures under construction adjacent to the mall, including a hotel, an office tower and a residential building.
Stories this photo appears in:
Silver Line Approaching Tysons
Route 7 lane shifts and paving, installation of sidewalks and streetlight foundations signal coming of Silver Line.
With construction completion of Phase 1 of the Dulles Corridor Metrorail Project anticipated in September, motorists and pedestrians are seeing an increase in project-related activities all along Leesburg Pike (Route 7) from the Dulles Toll Road to the overpass at Route 123.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment
Or login with:
OpenID